Congress appropriated $40.7 million for the project. “This award is the result of hard work, determination and good old-fashioned communications within the Library of Congress; between the Library and the Architect of the Capitol; and the AOC and the Library jointly communicating through the Army Corps of Engineers to the design and construction firms and subcontractors. This was a big job, and the team made it look easy,” said Neal Graham, chief of the Library’s Facility Services. “It’s a great honor to have this recognition bestowed on this joint project by the professional members of the CMAA,” said Acting Architect of the Capitol Stephen T. Ayers.
Buy it here: I am stuck between a rock and someone I want to hit withit shirt HomePage: 2020 Myhollybox HOt Store
Comments